大陆国语对白国产av片_五十路熟妇强烈无码_伊人天天躁夜夜躁狠狠_亚洲av无限制福利在线

Welcome to the official website of Jiangsu Sanji Industrial Co., Ltd.!
Jiangsu Sanji Industrial Co.,Ltd.

National hotline:

+86-523-88641502(Manager's office)

+86-523-88641154(Sales)

PRODUCTS

Production capacity and production process of reduction device

1. Catalyst production capacity

Our company has a total of 8 sets of reduction devices, each package is filled with 2m 3 . It takes 3~4 days according to the general catalyst reduction process. It takes 1~3 days for passivation. Each set drives two sets and starts once every two days. For a period of 8 days, the minimum capacity is 2m 3 per day . If the process cycle is 4 days, the maximum capacity is 4m 3 per day .

2. Catalyst reduction process

1. Catalyst reduction production process

2. Catalyst passivation production process

 

 

 

 

 

< BACK >
Jiangsu Sanji Industrial Co.,Ltd. I.D.:   @yuxinghg.com Jiangsu Sanji Industrial Co.,Ltd. P.W.: